The SITE patch represents the roles played by this crucial logistics team for Setup, Infrastructure, Teardown, & Egress. It is in the shape of a stopwatch, as timing is crucial to all SITE operations. There is a reticle superimposed over the watch, representing accuracy and survey. The patch is surrounded by the SITE motto: “First In, Last Out”. Also depicted are some tools of the trade; a tape measure, sledge hammer, wrench, & welder.
[concept & design by crow circa 2014]